demandPlus+

⌘K
  1. Home
  2. Docs
  3. demandPlus+
  4. 1.2*
  5. Precalculation
  6. Fields

Fields

General

Name Description
Include all Item Vendors Specifies whether pricing is done for all item vendors. Otherwise, only the vendor of the item/sku is used.
Explode Stock Items Indicates whether stock production will be exploded. If this field ist activated, all items with a production bom and “Replenishment System” = “Prod. Order” are exploded. Otherwise, the “Manufacturing Policy” must be “Make-to-Order”.
Precalculation Schema Template Code Specifies the precalculation schema template, which will be used for the created precalculation schemas.

Calculation

Name Description Calculation
Type
Specifies the type of the precalculation structure line.
No.
Specifies the number of the involved entry or record, according to the specified number series.
Variant Code
Specifies the variant of the item on the line.
Description
Specifies a description of the precalculation structure line.
Description 2
Specifies a description 2 of the precalculation structure line
Quantity per
Specifies how many units are required to produce the parent item.
a) In the case of an item or a module, the “quantity per” is the quantity from the production BOM.
b) In the case of a work center or work machine center
Quantity per = Quantity / Quantity (Base) (module)
BOM Quantity
Specifies a factor in case of a production bom. This includes possibly scrap.
BOM Quantity = A * B * C
A = Quantity per
B = 1 + scrap % (from BOM) / 100
C = BOM Quantity (if Production BOM within Production BOM)
If working without Type = Production BOM then
BOM Quantity = 1
In case of a work center or machine center
BOM Quantity = 0
Quantity Specifies the sum of components/time required to produce the parent item. a) In the case of an item or a module
Quantity = A * B * C * D * E * F + G
A = Quantity per
B = BOM Quantity
C = Quantity (of the module)
D = 1 + item scrap % (module) / 100
E = 1 + scrap % (component) / 100
F = 1+ Scrap Factor % (Accumulated) (routing)
G = Fixed Scrap Quantity (Accumulated) (routing)
b) In case of a work center or machine center
Quantity = A + B * (C * D * E +F)
A = Setup time
B = Run time
C = Quantity base (module)
D = 1 + Scrap Factor % (Accumulated)
E = 1 + Item scrap % (module) / 100
F = Fixed Scrap Quantity (Accumulated)
Quantity (Base) Specifies the sum of components in its base unit that are required to produce the parent item.
Scrap % Specifies the percentage of the item that you expect to be scrap in the manufacturing operation.
In the case of an item or module, the field is transferred from the production BOM.
In the case of a work center or machine center, the field is transferred from the routing.
Fixed Scrap Quantity
Specifies the fixed scrap quantity.
Scrap Factor % (Accumulated)
Specifies the Accumulated. Scrap factor % from the routing.
Item Scrap %
Specifies the percentage of the item that you expect to be scrap in the manufacturing operation.
This is the scrap deposited on the item. This is only taken into account in the case of a module. (See e.g. Quantity field) In other cases, this is purely informative information.
Total Quantity (Base) Specifies the required total quantity (related to the complete calculation) of an item in the base unit.
This field is filled only in case of an module or item and is used in pricing to take into account quantity scales. (See Direct Unit Cost field)
Calculation Quantity (Base)
Specifies the quantity used to calculate purchase prices and expected operation cost amt.
see: Quantity/Cost Logic
No. of Setup Processes
Specifies the number of setup processes required to produce the calculation quantity (base).
a) Maximum Order Quantity = 0
No. of Setup Processes = 1
b) Maximum Order Quantity > 0
No. of Setup Processes = Roundup(A / B)
A = Calculation Quantity (Base)
B = Maximum Order Quantity
Setup Factor
Specifies a factor that is used to calculate the expected operation cost amt. This is calculated from the number of setup processes and the calculation quantity (base). No. of Setup Processes / Calculation Quantity (Base)
Unit of Measure Code
Specifies how each unit is measured, such as in pieces or hours.
Operation No.
Specifies the operation number for this routing line.
Routing Link Code
Specifies the routing link code.
Unit Cost Calculation
Specifies which unit cost calculation should be made.
This field is transferred from the work center.
Expected Operation Cost Amt.
Specifies the total cost of operations.
see Quantity/Cost Logic
Expected Capacity Ovhd. Cost
Specifies the capacity overhead.
see Quantity/Cost Logic
Unit Cost (LCY)
Specifies the cost of one unit of the item or resource on the line.
a) In case of item, work center, machine center the corresponding field “Unit Price” from the master data is used.
b) Im Falle einer Baugruppe
Einstandspreis (MW) = Einstandsbetrag (MW) / Menge
Cost Amount (LCY)
Specifies the total cost of the the item or resource on the line.
a) In case of an item
Cost Amount (LCY) = Unit Cost (LCY) * Quantity
b) in case of work center or machine center
Cost Amount (LCY) = Expected Operation Cost Amt.
c) In the case of an module, the Cost Amount (LCY) is the sum of the “cost amounts (LCY)” of all related modules, items, work centers and machine centers.
Direct Unit Cost
Specifies the cost of one unit of the selected item or resource.
a) In case of item see Quantity/Cost Logic
b) In case of work center group or work centers, the EK price from the master data is used.
c) In the case of an module
Direct Unit Cost = Direct Cost Amount / Quantity
Direct Cost Amount
Specifies the total cost of the the item or resource on the line.
a) In case of an item
Direct Cost Amount = Direct Unit Cost * Quantity
b) In case of work centers or machine centers
Direct Cost Amount = Expected Operation Cost Amt.
c) In the case of an module, the “Direct Cost Amount” is the sum of the “direct cost amounts” of all related moduls, items, work centers and machine centers.
Vendor No.
Indicates the number of the vendor for which the lowest price was found. Especially in case all item vendor are taken into account in the price determination, the vendor no. may differ from the “main vedor”.
Item Category Code
Specifies the category that the item belongs to.
Run Time
Specifies the run time of the operation.
Setup Time
Specifies the setup time of the operation.
Move Time
Specifies the move time according to the value in the Move Time Unit of Measure field.
Wait Time
Specifies the wait time according to the value in the Wait Time Unit of Measure field.
Production BOM No.
Specifies the number of the production BOM that the item represents.
Routing No.
Specifies the number of the production routing that the item is used in.
Attached to Line No.
Specifies the line no. of the module, this line is attached to.
Level
Specifies the level of the exploded BOM.